CHAPTER 61:08:09

HISTORIC POWER BOILERS

Section

61:08:09:01        Definitions.

61:08:09:02        Schedule of inspections.

61:08:09:03        Inspection fees.

61:08:09:04        Appeal from decision by inspector.

61:08:09:05        Internal inspection of boilers.

61:08:09:06        Preparation of boiler for internal inspection.

61:08:09:07        Internal inspection -- Openings.

61:08:09:08        Internal inspection -- Evidence of overheating.

61:08:09:09        Internal inspection -- Condition of flues.

61:08:09:10        Internal inspection -- Checking for cracks.

61:08:09:11        Internal inspection -- Extent of corrosion.

61:08:09:12        Internal inspection -- Test of staybolts.

61:08:09:13        Maximum allowable working pressure.

61:08:09:14        Requirements for hydrostatic pretest.

61:08:09:15        Hydrostatic pretest -- Pipe requirements.

61:08:09:16        Hydrostatic pretest -- Steam gauge connections.

61:08:09:17        Hydrostatic pretest -- Steam gauge capacity.

61:08:09:18        Hydrostatic pretest -- Safety valve requirements.

61:08:09:19        Hydrostatic pretest -- Steam outlet requirements.

61:08:09:20        Hydrostatic pretest -- Blowoff valve requirements.

61:08:09:21        Hydrostatic pretest -- Feed water pipe requirements.

61:08:09:22        Hydrostatic pretest -- Feed water supply.

61:08:09:23        Hydrostatic pretest -- Water level indicator.

61:08:09:24        Requirements to perform hydrostatic test.

61:08:09:25        Required hydrostatic test pressure.

61:08:09:26        Hydrostatic test -- Required water temperature.

61:08:09:27        Hydrostatic test -- Safety valve and steam gauge requirements.

61:08:09:28        Duration of hydrostatic test.

61:08:09:29        Ultrasonic examination for thickness determination.

61:08:09:30        Internal inspection report.

61:08:09:31        External inspections and tests.

61:08:09:32        Preparation of boiler for external inspection.

61:08:09:33        External inspection -- Cleanliness and ASME compliance.

61:08:09:34        External inspection -- Evidence of leakage.

61:08:09:35        External inspection -- Water glass requirements.

61:08:09:36        External inspection -- Safety valve requirements.

61:08:09:37        External inspection -- Blowoff piping requirements.

61:08:09:38        External inspection report.

61:08:09:39        Repairs to historic power boilers.

61:08:09:40        Minor repairs.

61:08:09:41        Major repairs.

61:08:09:42        Tests following major repairs.

61:08:09:43        Repair methods.

61:08:09:44        Repair of defects.

61:08:09:45        Repair of cracks.

61:08:09:46        Repair of minor cracks and imperfections.

61:08:09:47        Repair of cracks radiating from holes.

61:08:09:48        Repair of welded butt joints.

61:08:09:49        Repair of wasted surfaces.

61:08:09:50        Welding on butt straps.

61:08:09:51        Staybolt replacement.

61:08:09:52        Inspection of welds.

61:08:09:53        Approval of major repairs and report.

61:08:09:54        Requirements for construction of new boilers.

61:08:09:55        Qualifications of inspectors.

Appendix A   Guide to Riveted Joint Efficiencies.