<html> <head> <meta name=Generator content="Microsoft Office HTML Filter 2.0"> <meta http-equiv=Content-Type content="text/html; charset=windows-1252"> <style> <!-- --> </style> </head> <body lang=EN-US link=blue vlink="#954F72"> <div> <p align=center><b>CHAPTER </b><b>20</b><b>:</b><b>10</b><b>:</b><b>39</b></p> <p align=center><b>&nbsp;</b></p> <p align=center><b>STRAY ELECTRICAL CURRENT AND VOLTAGE REMEDIATION RULES</b></p> <h1>Section</h1> <p><a href="DisplayRule.aspx?Rule=20:10:39:01">20:10:39:01</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:02">20:10:39:02</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Purpose of rules - Conformance to electrical codes.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:03">20:10:39:03</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Measurement and testing by utility.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:04">20:10:39:04</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Notice to utility.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:05">20:10:39:05</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cooperation between the dairy and utility.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:06">20:10:39:06</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Service provider.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:07">20:10:39:07</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualified testing professional.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:08">20:10:39:08</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualified testing analyst.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:09">20:10:39:09</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Additional qualified testing professional or analyst.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:10">20:10:39:10</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General requirements for stray voltage measuring and recording.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:11">20:10:39:11</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Calibration of measuring equipment.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:12">20:10:39:12</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Calibration certificates.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:13">20:10:39:13</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Field check of measuring equipment.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:14">20:10:39:14</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Requirements for monitoring systems and recording devices.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:15">20:10:39:15</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Requirements for load boxes.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:16">20:10:39:16</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stray current or voltage test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:17">20:10:39:17</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Testing sequence.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:18">20:10:39:18</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preventive action level not exceeded.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:19">20:10:39:19</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preventive action level exceeded.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:20">20:10:39:20</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Report prepared by qualified analyst.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:21">20:10:39:21</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Suspended or limited testing.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:22">20:10:39:22</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of remote reference electrodes.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:23">20:10:39:23</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inspection, repair, and measurement requirements.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:24">20:10:39:24</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of ammeters.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:25">20:10:39:25</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pre-test documentation.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:26">20:10:39:26</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Suspension of testing due to presence of a safety hazard.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:27">20:10:39:27</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The cow contact test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:28">20:10:39:28</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Conducting the cow contact test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:29">20:10:39:29</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of a voltmeter to conduct the cow contact test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:30">20:10:39:30</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of a milliammeter to conduct the cow contact test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:31">20:10:39:31</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Metal plate requirements.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:32">20:10:39:32</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the cow contact test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:33">20:10:39:33</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Source resistance calculation.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:34">20:10:39:34</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The 48 hour test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:35">20:10:39:35</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data collection for the 48 hour test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:36">20:10:39:36</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Measurement requirements for the 48 hour test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:37">20:10:39:37</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the 48 hour test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:38">20:10:39:38</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reduced recording period for the 48 hour test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:39">20:10:39:39</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The primary profile test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:40">20:10:39:40</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data collection for the primary profile test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:41">20:10:39:41</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the primary profile test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:42">20:10:39:42</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The secondary neutral voltage drop test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:43">20:10:39:43</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Conducting the secondary neutral voltage drop test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:44">20:10:39:44</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data collection for the secondary neutral voltage drop test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:45">20:10:39:45</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Measurements used for the secondary neutral voltage drop test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:46">20:10:39:46</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the secondary neutral voltage drop test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:47">20:10:39:47</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The load box test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:48">20:10:39:48</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Timing of the load box test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:49">20:10:39:49</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Conducting the load box test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:50">20:10:39:50</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data collection for the load box test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:51">20:10:39:51</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Calculating the K factor for the load box test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:52">20:10:39:52</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the load box test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:53">20:10:39:53</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The signature test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:54">20:10:39:54</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data collection for the signature test.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:55">20:10:39:55</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recording the signature test data.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:56">20:10:39:56</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Analysis of the data collected during the tests.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:57">20:10:39:57</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Determination of any contributions to stray current or voltage for single phase dairies.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:58">20:10:39:58</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Determination of any contributions to stray current or voltage for three-phase dairies.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:59">20:10:39:59</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Written report required - Copy to the dairy producer.</p> <p><a href="DisplayRule.aspx?Rule=20:10:39:60">20:10:39:60</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Remediation.</p> </div> </body> </html>