Codified Laws


Text Search




Enter the text to search for and click Search to get a list of statutes containing the text you entered. Tips:
  • Multiple words will be searched as a phrase. Entering Property Tax will return statutes that contain the complete phrase Property Tax.
  • Logical Operators are allowed. Hunting and Fishing will return statutes that containing both hunting and fishing. Hunting or Fishing will return statutes that contain hunting, fishing, or both.
  • Wild cards(*) are allowed. Entering Approp* will return statutes that contain Appropriation, Appropriate, Appropriated, etc..
  • Punctuation can also be used as operators. + = and, , = or. Searching for phrases that have , and will result in error unless you enclose the entire phrase in quotes.
The Filter option allows you to narrow your search results to a specific Title or Chapter. Here is a tip for using the filter option.
  • Use a dash (-) as the last character of your filter to refine searches. For example the filter "1-1" returns sections in 1-1, 1-10, 1-11, 1-12, etc. The filter "1-1-" returns only sections in Chapter 1-1.

Quick Find



Type the Statute number you are looking for in the form Title-Chapter-Section . Examples(1-1-1.1, 27A-11A-12, etc.)

The Get Statute button can be used to locate a specific statute. You may type in a title, chapter, or section number. Example: typing 1 will return the chapter list for Title 1, typing 1-1 will return the section list for chapter 1-1, typing 1-1-1 will return section 1-1-1 of the statutes.

The Get Chapter button can be used to load a complete chapter of the statutes. This function requires a title and a chapter number. Examples: 1-1, 57A-1, 1-3

 
     1-33B-3.13.   Annual guaranteed cost savings--Shortfall. Except as provided in this section, the qualified energy service provider shall pay the governmental unit the amount of any verified annual guaranteed cost savings shortfall each year until guaranteed cost savings are achieved for each year in an initial monitoring period as established in § 1-33B-3.12. The amount of cost savings achieved during a year shall be determined using the baseline rates used in guaranteed cost savings.
     In the case of a shortfall, the governmental unit and qualified energy service provider may negotiate the terms of measurement and verification reports and the shortfall payment for the remainder of the energy performance contract finance term.
     If there is an excess in cost savings in any year of the guarantee period, the guaranteed cost savings remain with the governmental unit. Guaranteed cost savings may not be used to cover potential shortfalls in subsequent years or actual guaranteed cost savings shortages in previous years of a guarantee period.

Source: SL 2016, ch 14, § 15.


Back to Chapter 1-33B