Codified Laws


Text Search




Enter the text to search for and click Search to get a list of statutes containing the text you entered. Tips:
  • Multiple words will be searched as a phrase. Entering Property Tax will return statutes that contain the complete phrase Property Tax.
  • Logical Operators are allowed. Hunting and Fishing will return statutes that containing both hunting and fishing. Hunting or Fishing will return statutes that contain hunting, fishing, or both.
  • Wild cards(*) are allowed. Entering Approp* will return statutes that contain Appropriation, Appropriate, Appropriated, etc..
  • Punctuation can also be used as operators. + = and, , = or. Searching for phrases that have , and will result in error unless you enclose the entire phrase in quotes.
The Filter option allows you to narrow your search results to a specific Title or Chapter. Here is a tip for using the filter option.
  • Use a dash (-) as the last character of your filter to refine searches. For example the filter "1-1" returns sections in 1-1, 1-10, 1-11, 1-12, etc. The filter "1-1-" returns only sections in Chapter 1-1.

Quick Find



Type the Statute number you are looking for in the form Title-Chapter-Section . Examples(1-1-1.1, 27A-11A-12, etc.)

The Get Statute button can be used to locate a specific statute. You may type in a title, chapter, or section number. Example: typing 1 will return the chapter list for Title 1, typing 1-1 will return the section list for chapter 1-1, typing 1-1-1 will return section 1-1-1 of the statutes.

The Get Chapter button can be used to load a complete chapter of the statutes. This function requires a title and a chapter number. Examples: 1-1, 57A-1, 1-3

 
     46A-1-94.   Perkins County rural water system. Pursuant to §§ 46A-1-11 to 46A-1-13, inclusive, construction of a twenty-seven million nine hundred ninety-nine thousand two hundred fifty dollar Perkins County rural water system as generally described in the report, Final Engineering Report, for Perkins County Rural Water System Inc., Bison, South Dakota, dated January 2003, is hereby authorized for the purpose of providing safe and adequate municipal, rural, and industrial water supplies in Perkins County.
     The Legislature finds that it is in the best interest of the Perkins County rural water system to provide a portion of the nonfederal matching requirements as enumerated in P.L. 106-136 as amended to January 1, 2011, through the state water resources management system revolving loan program. The Board of Water and Natural Resources may provide loans under the state water resources management system revolving loan program in amounts not to exceed a total of four million five hundred thousand dollars to the Perkins County rural water system to provide a portion of the nonfederal matching requirements as enumerated in P.L. 106-136 as amended to January 1, 2011. No disbursements may be made under the loans authorized by this section unless funds are appropriated by the Legislature in conformance with § 46A-1-61.
     Notwithstanding the provisions of § 46A-1-66, no interest may accrue until the Board of Water and Natural Resources certifies the completion of the construction of the project as authorized. The initial loan repayment is due and payable one year following the certification of construction completion. Loan terms and conditions shall be set by the Board of Water and Natural Resources.
     The Board of Water and Natural Resources may provide grants in amounts not to exceed two million five hundred thousand dollars, or so much thereof as may be necessary, to the Perkins County rural water system project to provide the State of South Dakota's portion of the nonfederal matching requirements for the project. No disbursements may be made under the grant authorized by this section unless funds are appropriated by the Legislature in conformance with § 46A-1-61.
     The loan and grant authorized by this section may be increased or decreased by such amounts as may be justified by reason of ordinary fluctuations in development costs incurred after January 1, 2001, as indicated by engineering costs indices applicable for the type of construction involved.

Source: SL 1996, ch 265, § 11; SL 2004, ch 52, § 5, eff. Feb. 25, 2004; SL 2011, ch 165, § 310.


Get Chapter 46A-1
Back to Chapter 46A-1