74:55:01:11. Authorizing new injection wells under area
permit. The area permit may authorize the permittee to construct and
operate new injection wells within the permit area provided the following
requirements are met:
(1) The permittee notifies
the secretary quarterly when and where new wells have been or will be located;
(2) The additional well
meets the area permit criteria in § 74:55:01:10; and
(3) The cumulative effect
of drilling and operation of additional injection wells is considered by the
secretary during evaluation of the area permit application and is acceptable to
the secretary.
If the additional well does not meet
the area permit requirements, the secretary may modify, terminate, or enforce
the permit.
Source:
8 SDR 71, effective December 24, 1981; 13 SDR 129, 13 SDR 141, effective
July 1, 1987; transferred from § 74:03:11:11, July 1, 1996; 34 SDR
279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-36.