          74:02:08:05.01.  Preliminary risk assessment. The chief engineer may request a preliminary risk assessment. The preliminary risk assessment shall consist of an on-site inspection of the downstream area with a description of any structures and an elevation in reference to the stream channel bottom. The hazard classification is subject to approval of the preliminary risk assessment by the chief engineer. The preliminary risk assessment must be performed by an engineer as defined in this chapter.

 

          Source: 15 SDR 158, effective April 23, 1989.

          General Authority: SDCL 46-2-5, 46-7-3.

          Law Implemented: SDCL 46-1-15, 46-5-8, 46-5-10, 46-5-11, 46-5-30, 46-7-3, 46-7-5.

 