Text Search

Quick Find


Enter a Rule Number and click Get Rule to load the Rule. You can enter any Article, Chapter, or Section number. Examples(01:15, 01:15:01, 01:15:01:01, etc.). Use the Get All button to load and entire article or chapter.

Download Rule 74:02:08:07.02 in Microsoft Word Format Printer Friendly

          74:02:08:07.02.  Category 2 spillway design flood exemption. Unless the reservoir of a category 2 dam serves as the sole water supply source for a water distribution system, the spillway design flood for a new or rebuilt intermediate size category 2 dam may be lowered to a design flood between the 0.5 PMF and 100-year spillway design flood based upon a risk assessment. The risk assessment must be submitted to and approved by the chief engineer.

 

          Source: 14 SDR 67, effective November 8, 1987.

          General Authority: SDCL 46-2-5, 46-7-3.

          Law Implemented: SDCL 46-5-8, 46-5-30, 46-7-3, 46-7-5.

 


Back to 74:02:08 | 74:02:08:07.02 RSS

Click message to listen