<html> <head> <meta name=Generator content="Microsoft Office HTML Filter 2.0"> <meta http-equiv=Content-Type content="text/html; charset=windows-1252"> <meta name=Originator content="Microsoft Word 10"> <title>Rule 74:29:11 IN SITU LEACH MINING</title> <META NAME="Keywords" Content="Administrative Rules 74:29:11"> <META NAME="Description" Content="Administrative Rules 74:29:11 IN SITU LEACH MINING"> <style> <!-- --> </style> </head> <body lang=EN-US> <div> <p align=center><b>CHAPTER 74:29:11</b></p> <p align=center><b>&nbsp;</b></p> <p align=center><b>IN SITU LEACH MINING</b></p> <p>Section</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:01">74:29:11:01</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application for in situ leach mine permit -- Contents.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:01.01">74:29:11:01.01</a>&nbsp;&nbsp; Underground injection control -- Class III Well permit required for mine permit.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:02">74:29:11:02</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application content requirements -- Additional baseline information required.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:03">74:29:11:03</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application content requirements -- Mine operations plan.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:04">74:29:11:04</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application content requirements -- Reclamation plan.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:05">74:29:11:05</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Determination of ground water restoration demonstration.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:06">74:29:11:06</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Ground water restoration table.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:07">74:29:11:07</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Establishment of baseline water quality in new mining areas.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:08">74:29:11:08</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Technical revisions to an in situ leach mine permit.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:09">74:29:11:09</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Designation of exempted aquifers.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:10">74:29:11:10</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Injection wells subject to the provisions of this chapter.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:11">74:29:11:11</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Well location and protection.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:12">74:29:11:12</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Well construction requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:13">74:29:11:13</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Well construction requirements -- Injection wells.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:14">74:29:11:14</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Minimum requirements for monitor wells.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:15">74:29:11:15</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Disposal of drill cuttings.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:16">74:29:11:16</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mechanical integrity testing of injection wells.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:17">74:29:11:17</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Supervision of well construction and testing.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:18">74:29:11:18</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Requirements for plugging drill holes and repair, conversion, and plugging wells.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:19">74:29:11:19</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Corrective actions for improperly sealed wells.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:20">74:29:11:20</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Authorizing new injection wells within permit area boundary.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:21">74:29:11:21</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design and construction of in situ leach mine surface facilities.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:22">74:29:11:22</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Construction quality assurance plan.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:23">74:29:11:23</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pond and surface impoundment design and construction requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:24">74:29:11:24</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pipeline design and construction requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:25">74:29:11:25</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Recovery plant and satellite facility design and construction requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:26">74:29:11:26</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Uranium byproduct material handling and disposal systems.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:27">74:29:11:27</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Disposal of liquid waste.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:28">74:29:11:28</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Disposal of nonradioactive solid waste.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:29">74:29:11:29</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Prohibitions -- Injection volumes and pressure.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:30">74:29:11:30</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Production area operational monitoring requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:31">74:29:11:31</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Production area monitor well location and spacing requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:32">74:29:11:32</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Nonproduction zone monitoring.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:33">74:29:11:33</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Subsidence monitoring.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:34">74:29:11:34</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Confinement of recovery fluid.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:35">74:29:11:35</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting excursions.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:36">74:29:11:36</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Verifying analysis.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:37">74:29:11:37</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Excursion sampling frequency.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:38">74:29:11:38</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Remedial action for excursion.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:39">74:29:11:39</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Excursions -- Controlled.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:40">74:29:11:40</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Excursions -- Not controlled.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:41">74:29:11:41</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Criteria for determination of adequacy of remedial action plan.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:42">74:29:11:42</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:43">74:29:11:43</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Well construction records.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:44">74:29:11:44</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Well plugging records.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:45">74:29:11:45</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Maintenance and retention of records.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:46">74:29:11:46</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Ground water restoration requirements.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:47">74:29:11:47</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Restoration sampling procedure.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:48">74:29:11:48</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Restoration progress reports.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:49">74:29:11:49</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Final restoration -- Restoration values achieved.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:50">74:29:11:50</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Restoration values not achieved.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:51">74:29:11:51</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Closure of mine site following restoration.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:52">74:29:11:52</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reclamation of in situ leach mine surface facilities.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:53">74:29:11:53</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Radiation survey of surface facilities at mine closure.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:54">74:29:11:54</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Radiation standards for closure of surface facilities.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:55">74:29:11:55</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Postclosure plan -- Estimated costs for postclosure care.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:56">74:29:11:56</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General postclosure inspection and maintenance activities.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:57">74:29:11:57</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Postclosure operation of monitoring systems.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:58">74:29:11:58</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Ground water contamination during the postclosure period.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:59">74:29:11:59</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; End of the postclosure period.</p> <p><a href="DisplayRule.aspx?Rule=74:29:11:60">74:29:11:60</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Public notice for in situ leach mines.</p> </div> </body> </html>