46-7-1
Excess capacity of works--Availability for beneficial use.
46-7-2
Headgates or other measuring devices required.
46-7-3
Repair of works required--Rules.
46-7-4
Repealed.
46-7-5
Inspection of works by chief engineer--Order for repair of unsafe works--Repair
by chief engineer--Costs--Filing of written protest--Hearing--Liability of chief
engineer and state.
46-7-5.1
Repair of unsafe works by chief engineer--Cost as lien against property--Bidding
provisions.
46-7-5.2
Breach or repair of works by chief engineer to protect human life--Cost as lien
against property--Other remedies.
46-7-5.3
Investigation of dam--Variance relating to minimum spillway design
requirements--Hearing.
46-7-5.4
Definition of terms.
46-7-5.5
Application to dams constructed before January 1, 1990--Owner and family sole
residents--Determination of flood plain.
46-7-5.6
Owner's reporting requirements where nonowner establishes habitation within
flood plain.
46-7-5.7
Privately owned high-hazard dam--Where chief engineer and state not obligated
to secure safety thereof--Owner's affidavit upon refusal to correct unsafe
condition.
46-7-5.8
Requirements as to form and content of owner's affidavit.
46-7-5.9
Board's acceptance of owner's affidavit--Conditions.
46-7-5.10
Recording requirements as to owner's affidavit.
46-7-5.11
Where privately owned high-hazard dam is subject to action by chief engineer
and state.
46-7-6
Repealed.
46-7-7 to 46-7-11.
Repealed.
46-7-12
Willful damage, destruction, or interference with works prohibited.
46-7-13
Repealed.
46-7-14
Unauthorized injury to or interference with pier, boom, or dam prohibited.
46-7-15
Removal or injury of piles prohibited.