<html> <head> <title>Rule 74:29:02:04 Mining and milling methods.</title> <META NAME="Keywords" Content="Administrative Rules 74:29:02:04"> <META NAME="Description" Content="Administrative Rules 74:29:02:04 Mining and milling methods."> <meta name=Generator content="Microsoft Office HTML Filter 2.0"> <meta http-equiv=Content-Type content="text/html; charset=windows-1252"> <meta name=Originator content="Microsoft Word 10"> <style> <!-- --> </style> </head> <body lang=EN-US> <div> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>74:29:02:04.&nbsp;&nbsp;Mining and milling methods.</b> For SDCL <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=45-6B-6">45-6B-6(8)</A>, a permit application is considered procedurally complete if the following items are included:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (1)&nbsp;&nbsp;A narrative description of the mining and milling techniques to be employed;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (2)&nbsp;&nbsp;A narrative description of and plan view maps depicting the premining contours and proposed postmining topography;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (3)&nbsp;&nbsp;A narrative description of the proposed depth and direction of mining and representative cross-sections depicting the premining and proposed postmining land surface;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (4)&nbsp;&nbsp;A map depicting the proposed locations of tailings dams, waste dumps, ore stockpiles, or other mine spoil material;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (5)&nbsp;&nbsp;A stability analysis for all critical earth structures; and</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (6)&nbsp;&nbsp;A description of the proposed blast procedures and a proposed program for mitigating resulting fugitive dust, noise, and potential structural or stability damage outside the permit area.</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Source:</b> 14 SDR 111, effective March 3, 1988.</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>General Authority:</b> SDCL <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=45-6B-81">45-6B-81.</A></font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Law Implemented:</b> SDCL <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=45-6B-6">45-6B-6.</A></font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> </div> </body> </html>