<html> <head> <title>Rule 74:31:03:04 Asbestos abatement contractor and supervisor training course requirements.</title> <META NAME="Keywords" Content="Administrative Rules 74:31:03:04"> <META NAME="Description" Content="Administrative Rules 74:31:03:04 Asbestos abatement contractor and supervisor training course requirements."> <meta name=Generator content="Microsoft Office HTML Filter 2.0"> <meta http-equiv=Content-Type content="text/html; charset=windows-1252"> <meta name=Originator content="Microsoft Word 10"> <style> <!-- --> </style> </head> <body lang=EN-US> <div> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>74:31:03:04.&nbsp;&nbsp;Asbestos abatement contractor and supervisor training course requirements.</b> The asbestos abatement contractor and supervisor training course must be at least five days long and must include lectures, demonstrations, at least fourteen hours of hands-on training, individual respirator fit testing, course review, and a written examination. The following topics must be included:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (1)&nbsp;&nbsp;The physical characteristics of asbestos and asbestos-containing materials:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Identification of asbestos:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Aerodynamic characteristics;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(ii)Typical uses;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Physical appearance;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;A review of hazard assessment considerations;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;A summary of abatement control options;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (2)&nbsp;&nbsp;Potential health effects related to asbestos exposure:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;The nature of asbestos-related diseases;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Routes of exposure;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;Dose-response relationships and the lack of a safe exposure level;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;Synergism between cigarette smoking and asbestos exposure;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp;The latency period of asbestos-related diseases;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (3)&nbsp;&nbsp;Employee personal protective equipment:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp; Classes and characteristics of respirators;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp; Limitations of respirators;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp; Selection, inspection, donning, use, maintenance, and storage procedures for respirators;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp; Methods for field testing of the facepiece-to-face seal (positive and negative pressure fitting tests);</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp; Qualitative and quantitative fit testing procedures;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (f)&nbsp;&nbsp;&nbsp; Variability between field and laboratory protection factors;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (g)&nbsp;&nbsp; Factors that alter respirator fit, for example, facial hair;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (h)&nbsp;&nbsp; The components of a respiratory protection program;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (i)&nbsp;&nbsp;&nbsp; Selection and use of personal protective clothing;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (j)&nbsp;&nbsp;&nbsp; Use, storage, and handling of nondisposable clothing;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (k)&nbsp;&nbsp; Regulations found in subdivision (9) of this section covering personal protective equipment;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (4)&nbsp;&nbsp;State-of-the-art work practices:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Work practices for asbestos abatement activities:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Descriptions of construction and maintenance of barriers and decontamination enclosure systems;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (ii)Positioning of warning signs;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Electrical and ventilation system lockout;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iv)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Working techniques for minimizing fiber release;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (v)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of wet methods;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(vi)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of negative pressure ventilation equipment;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(vii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Use of high efficiency particulate air (HEPA) vacuums;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (viii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Clean-up and disposal procedures;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Work practices for removal, encapsulation, enclosure, and repair;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;Emergency procedures for sudden releases;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;Potential exposure situations;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp;Transport and disposal procedures;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (f)&nbsp;&nbsp;Recommended and prohibited work practices;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (g)&nbsp;&nbsp;Discussion of new abatement-related techniques and methodologies;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (5)&nbsp;&nbsp;Personal hygiene:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Entry and exit procedures for the work area;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Use of showers;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;Avoidance of eating, drinking, smoking, and the chewing of gum or tobacco in the work area;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;Potential exposures, such as family exposure;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (6)&nbsp;&nbsp;Additional safety hazards:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Hazards encountered during abatement activities and how to deal with them:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Electrical hazards;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(ii)Heat stress;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Air contaminants other than asbestos;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iv)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fire and explosion hazards;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (v)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scaffold and ladder hazards;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(vi)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Slips, trips, and falls;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(vii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Confined spaces;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (7)&nbsp;&nbsp;Medical monitoring -- OSHA requirements found in subdivision (9)(c) and (9)(d) of this section for a pulmonary function test, chest X rays, and a medical history for each employee;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (8)&nbsp;&nbsp;Air monitoring procedures to determine airborne concentrations of asbestos fibers:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;A description of aggressive sampling;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Sampling equipment and methods;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;Reasons for air monitoring;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;Types of samples;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp;Interpretation of results, specifically from analysis performed by polarized light, phase-contrast, and electron microscopy analyses;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (9)&nbsp;&nbsp;Regulatory review -- procedures and standards, including:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Requirements of AHERA;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;National emission standard for hazardous air pollutants in 40 C.F.R. §&nbsp;61, Subparts A (general provisions) and M (national emission standard for asbestos) (July 1, 1993);</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;OSHA standards for permissible exposure to airborne concentrations of asbestos fibers and respiratory protection in 29 C.F.R. §&nbsp;1910.134 (July 1, 1993) as amended by 59 Fed. Reg. 40,964 to 41,162, inclusive (August 10, 1994);</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;OSHA asbestos construction standard in 29 C.F.R. §&nbsp;1926.58 (July 1, 1993) as amended by 59 Fed. Reg. 40,964 to 41,162, inclusive (August 10, 1994);</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp;EPA worker protection rule in 40 C.F.R. §&nbsp;763, Subpart G (July 1, 1993);</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (10)&nbsp;&nbsp;Respiratory protection programs and medical surveillance programs;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (11)&nbsp;&nbsp;Insurance and liability issues:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Contractor issues:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Worker's compensation coverage and exclusions;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(ii)Third-party liabilities and defenses;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <font size=3 face="Times New Roman">(iii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Insurance coverage and exclusions;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (12)&nbsp;&nbsp;Record keeping for asbestos abatement projects:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Records required by federal regulations found in subdivision (9) of this section, state regulations found in chapter 74:36:08 and SDCL chapter <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44">34-44</A>, and local regulations;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Records recommended for legal and insurance purposes;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (13)&nbsp;&nbsp;Supervisory techniques for asbestos abatement activities -- supervisory practices to enforce and reinforce the required work practices and discourage unsafe work practices;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (14)&nbsp;&nbsp;Contract specifications -- discussion of key elements that are included in contract specifications;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (15)&nbsp;&nbsp;Hands-on training that gives actual experience performing tasks associated with asbestos abatement:</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (a)&nbsp;&nbsp;Working with asbestos-substitute materials;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (b)&nbsp;&nbsp;Fitting and using respirators;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c)&nbsp;&nbsp;Use of glovebags;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d)&nbsp;&nbsp;Donning protective clothing;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (e)&nbsp;&nbsp;Constructing a decontamination unit;</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (16)&nbsp;&nbsp;Course review -- a review of key aspects of the training course.</font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Source:</b> 14 SDR 164, effective June 5, 1988; 15 SDR 50, effective October 3, 1988; 18 SDR 95, effective December 2, 1991; 21 SDR 101, effective December 4, 1994.</font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>General Authority:</b> SDCL <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-3">34-44-3</A>, <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-19">34-44-19.</A></font></p> <p><font size=3 face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Law Implemented:</b> SDCL <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-3">34-44-3</A>, <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-4">34-44-4</A>, <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-20">34-44-20</A>, <A HREF="/statutes/DisplayStatute.aspx?Type=Statute&Statute=34-44-21">34-44-21.</A></font></p> <p><font size=3 face="Times New Roman">&nbsp;</font></p> </div> </body> </html>