46-5-40. Temporary use permits--Cancellation.
The chief engineer may not cancel a temporary use permit with less than six months notice to the permit holder. In no case may a temporary use permit be cancelled prior to the time at which facilities are constructed and water may be put to beneficial use by an entity described in § 46-5-38 holding a permit under the provisions of § 46-5-38.1. No person may acquire any right under a temporary permit to the use of water beyond the time of cancellation of the temporary use permit.
Source: SL 1955, ch 430, § 1; SDC Supp 1960, § 61.0122; SL 1961, ch 456; SL 1966, ch 259, § 3; SL 1983, ch 314, § 73.
46-5-40.1. Temporary permits for use of public water for construction, testing, or drilling purposes--Term of permit--Qualifications and limitations.
The Water Management Board may promulgate rules to authorize the chief engineer to issue temporary permits for the use of public water for construction, testing, or drilling purposes. No temporary permit is valid after December thirty-one of the year in which the permit is issued. No temporary permit may be issued if the permit interferes with or adversely affects prior appropriations or vested rights. A temporary permit shall contain qualifications and limitations necessary to protect the public interest. The issuance of a temporary permit is permission to use public water on a temporary basis and does not grant any water rights.
Source: SL 1987, ch 328, § 5.