46A-4-4Petition for formation of irrigation district--Map of proposed district to accompany, contents.

When a petition is filed with the Board of Water and Natural Resources, it shall be accompanied by a map of the proposed district. The map shall show at an appropriate scale the location of the proposed canal or the works intended to irrigate the lands of the proposed district and the canals situated within the boundaries of the proposed district, except those canals that merely pass through the lands and do not irrigate any of those lands. If the water supply is from a natural stream, the flow of the stream shall be stated in cubic feet per second. If the water supply for the district is to be gathered by a storage reservoir, the map shall show the location of the proposed reservoir and shall give its capacity in acre-feet. Cross sections of proposed canals and all proposed dams and embankments shall be submitted in sufficient detail to show the contemplated method of construction. The capacity shall be stated in cubic feet per second of such proposed and such existing canals. The map and cross sections shall be certified as accurate by a competent irrigation engineer.

Source: SDC 1939, § 61.0802; SL 1947, ch 417, § 2; SL 1963, ch 455, § 2; SDCL, § 46-12-4; SL 1984, ch 294, § 5.




SDLRC - Codified Law 46A-4-4 - Petition for formation of irrigation district--Map of proposed district to accompany, contents.

46A-4-4.1Notice of hearing to consider petition--Publication--Contents--Approval of petition--Fixing date for election.

After a petition is filed with the Board of Water and Natural Resources, the board shall publish a notice of a hearing to consider the petition. The publication shall be once a week for two consecutive weeks in at least one official newspaper in each county where any portion of the proposed district will lie. The second publication may not be more than thirty nor less than twenty days before the hearing. The notice shall inform landowners of their right to inclusion or exclusion of their lands in the proposed district pursuant to §§ 46A-4-8 and 46A-4-12. After determining that the petition is in compliance with the provisions of this chapter, the board shall examine the petition, maps, related documents, and statements of interested persons. If necessary, the board shall further examine the proposed district, the works proposed to be utilized and the proposed location of the works. If the board determines that the proposed district is feasible and practicable, it shall by resolution approve the formation of an irrigation district as set forth in the petition, including any modifications of boards, and fix a date for an election on the question of formation.

Source: SL 1984, ch 294, § 6; SL 1986, ch 27, § 49.