74:55:01:51. Excursion sampling frequency. During the
time when any control parameter is present in a monitor well, a water sample
shall be taken at least two times a week from the well. The samples must be
analyzed for all control parameters within one week after the sample is taken.
Source:
8 SDR 71, effective December 24, 1981; 13 SDR 129, 13 SDR 141, effective
July 1, 1987; transferred from § 74:03:11:51, July 1, 1996; 34 SDR
279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-44.
Online Archived History:
There are currently no online archives for this rule.