Introduced by: Representatives Brunner and Soli and Senators Tieszen and Heinert
|
FOR AN ACT ENTITLED, An Act to allow for additional time to review certain competitive
sealed bids.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF SOUTH DAKOTA:
Section 1. That § 5-18A-5 be amended to read:
5-18A-5. The following procedures apply to the use of competitive sealed bids:
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF SOUTH DAKOTA:
Section 1. That § 5-18A-5 be amended to read:
5-18A-5. The following procedures apply to the use of competitive sealed bids:
(1) Public notice of the invitation for bids shall be given pursuant to § 5-18A-14;
(2) The invitation for bids shall include a purchase description, and all contractual terms
and conditions applicable to the procurement. The invitation for bids for supplies
shall include the length of time, not to exceed forty-five days, between the bid
opening and the award of the bid;
(3) A bid may be submitted either manually or electronically in a manner authorized by
the purchasing agency;
(4) Each bid shall be opened publicly in the presence of one or more witnesses at the
time and place designated in the invitation for bids. The amount of each bid, and such
other relevant information as may be specified, together with the name of each bidder
shall be recorded. Except as otherwise provided by law, the record and each bid shall
be open to public inspection;
(5) Each bid shall be unconditionally accepted without alteration or correction, except
as authorized in this section. Each bid shall be evaluated based on the requirements
set forth in the invitation for bids, which may include criteria to determine
acceptability such as inspection, testing, quality, workmanship, delivery, and
suitability for a particular purpose. Those criteria that will affect the bid price and be
considered in evaluation for award shall be objectively measurable, such as
discounts, transportation costs, and total or life cycle costs. The invitation for bids
shall set forth the evaluation criteria to be used. No criteria may be used in bid
evaluation that are not set forth in the invitation for bids;
(6) Any bid may be withdrawn by letter or, by electronic communications, or in person
before the time specified in the advertisement therefor for bid. The purchasing agency
may allow modification of bids by mail, facsimile, or electronic notice received at the
place designated in the invitation to bid not later than the time set for the opening of
bids. A modification may not reveal the bid price but shall provide the addition or,
subtraction, or the modification so that the final prices or terms will not be known to
the purchasing agency until the sealed bid is opened. A modification may not be
withdrawn after the time set for the opening of bids. Each modification shall be
confirmed in writing by the successful bidder before award of the contract. No bid
made may be changed or altered by telephone. After bid opening, no withdrawal of
a bid or change in bid prices or other provisions of bids prejudicial to the interest of
the purchasing agency or fair competition is permitted. The purchasing agency may
waive technical irregularities in the bid or proposal of the low bidder or offeror which
irregularities that do not alter the price, quality, or quantity of the services, or items
of tangible personal property bid or offered. Any decision to permit the correction or
withdrawal of a bid, or to cancel an award or a contract based on a bid mistake, shall
be supported by a written determination made by the purchasing agency, and
included in the bid file;
(7) The contract for services or public improvement shall be awarded within thirty days
and the contract for supplies shall be awarded withing forty-five days of the bid
opening by written notice to the lowest responsible and responsive bidder whose bid
meets the requirements and criteria set forth in the invitation for bids. The purchasing
agency may reject any and all bids and readvertise for bids if none of the bids are
satisfactory, or if the purchasing agency believes an agreement has been entered into
by the bidders to prevent competition. If the low bidder is not responsible or the bid
is not made in accordance with the requirements of this chapter and chapters 5-18B,
5-18C, and 5-18D or the low bid is withdrawn as authorized by this section, the bid
of the next lowest responsible and responsive bidder may be accepted;
(8) If it is considered impractical to initially prepare a purchase description to support an
award based on price, an invitation for bids may be issued requesting the submission
of unpriced offers to be followed by an invitation for bids limited to those bidders
whose offers have been qualified under the criteria set forth in the first solicitation;
(9) If, after advertising for bids, no firm bids are received, the purchasing agency may
negotiate a contract for the purchase of the supplies, services, or public improvement
projects at the most advantageous price, if the specifications of the original bid are
met;
(10) If two or more competitive sealed bids submitted are identical in price and product
quality, the bids are the low bid, and no resident bidder preference is applicable, the
purchasing agency may:
(a) Award the bid by lottery to one of the identical low bidders; or
(b) Reject all the bids and resolicit bids for the required supplies, services, or
public improvement.
Section 2. That § 5-18A-35 be amended to read:
5-18A-35. In the procurement of supplies or services, a purchasing agency may require a bond or an approved security to be submitted with any bid or proposal as a guarantee that the bidder will enter into a contract with the purchasing agency. No offeror or bidder may be required to leave the bond or security posted for a longer period thanthirty days that allowed
by section 1 of this Act if the bid or proposal is not accepted. The bond or approved security of
the successful offeror or bidder shall be returned upon the signing of the contract.
Section 3. That § 5-18B-9 be amended to read:
5-18B-9. No bidder on a public improvement contract may be required, either in the invitation for bids or otherwise, to leave a certified check or cashier's check, or bid bond, posted for a longer period thanthirty days that allowed by section 1 of this Act if the bid is not
accepted. The check or bid bond of the successful bidder shall be returned upon the execution
of the contract and surety hereafter provided for. The checks or bid bonds of all unsuccessful
bidders shall be, by the purchasing agency, immediately returned to the respective makers
thereof and not more than thirty forty-five days shall elapse between the opening of the bids and
either the acceptance of the bid of the lowest responsible bidder or the rejection of all of the bids
presented.
Section 2. That § 5-18A-35 be amended to read:
5-18A-35. In the procurement of supplies or services, a purchasing agency may require a bond or an approved security to be submitted with any bid or proposal as a guarantee that the bidder will enter into a contract with the purchasing agency. No offeror or bidder may be required to leave the bond or security posted for a longer period than
Section 3. That § 5-18B-9 be amended to read:
5-18B-9. No bidder on a public improvement contract may be required, either in the invitation for bids or otherwise, to leave a certified check or cashier's check, or bid bond, posted for a longer period than