MyLRC +
Administrative Rules
Rule 70:10:01:05 Contents of application.

          70:10:01:05.  Contents of application. An applicant shall submit a utility corridor permit application on a form approved by the department. The application shall include the following:

 

          (1)  The name and address of the applicant;

          (2)  The description of the location of the utility corridor where the utility line or facility will be relocated or installed;

          (3)  The type of utility installation requested;

          (4)  Whether the utility line or facility has been displaced as a result of a highway construction project and, if so, the project that caused the displacement and the location of the utility line or facility prior to the displacement;

          (5)  The name and address of the person to whom any notice required by these rules shall be given;

          (6)  A proposed utility corridor installation plan or design;

          (7)  Proof of liability insurance which is adequate for the liabilities presented; and

          (8)  The signature of the applicant.

 

          Source: 32 SDR 32, effective August 30, 2005.

          General Authority: SDCL 31-19-1.1.

          Law Implemented: SDCL 31-19-1.1.

 

Online Archived History: