74:02:01:35. Expiration date of temporary permits.Repealed.
Source: SL 1975, ch 16, § 1; transferred from § 52:01:01:33, effective July 1, 1979; 9 SDR 96, effective January 30, 1983; 10 SDR 27, effective September 26, 1983; repealed, 13 SDR 49, effective October 27, 1986.
74:02:01:35.01. Application procedure for flood control permits. An applicant for a flood control permit shall complete an application on forms supplied by the chief engineer in accordance with §§ 74:02:01:06 to 74:02:01:10, inclusive. The application shall be considered pursuant to procedures in SDCL chapter 46-2A. An application for a flood control permit may include an appropriation of water depending on the type of project. If the application is contested, the board shall decide after a hearing if the application is to be approved. If the application is uncontested, the chief engineer may issue a flood control permit on behalf of the board pursuant to § 74:02:01:12.03.
Source: 20 SDR 53, effective October 20, 1993.
General Authority: SDCL 46-1-16, 46-2-3.1, 46-2-5, 46-5-11.
Law Implemented: SDCL 46-1-14, 46-1-15, 46-1-16, 46-2-3.1, 46-2A-11, 46-2A-23, 46-5-10, 46-5-11, 46-5-47.
74:02:01:35.02. Inspection of flood control works -- Licensing. The chief engineer shall inspect flood control works constructed under a flood control permit to determine if the project works are constructed in accordance with SDCL 46-5-30 and 46-5-47. Following completion of an inspection and compliance with SDCL 46-5-30.1, the chief engineer shall issue a license for the project.
Source: 20 SDR 53, effective October 20, 1993.
General Authority: SDCL 46-2-5.
Law Implemented: SDCL 46-2A-11, 46-5-30, 46-5-30.1, 46-5-47.