74:55:01:53.02. Excursions -- Not controlled. If an
excursion is not controlled within 30 days following confirmation of the
excursion, a sample must be collected from each of the affected monitoring wells and analyzed for
the following parameters: ammonia, antimony, arsenic, barium, beryllium,
bicarbonate, boron, cadmium, calcium, carbonate, chloride, chromium,
conductivity, copper, fluoride, gross alpha, gross beta, iron, lead, magnesium,
manganese, mercury, molybdenum, nitrate, nitrate + nitrite, pH, potassium,
selenium, sodium, sulfate, radium-226 and 228, thallium, total dissolved
solids, uranium, vanadium, and zinc, and any other parameter specified by the
secretary, unless the secretary determines that the concentration or value of
one or more parameters is not likely to occur as a result of the in situ leach
mine.
If an excursion is not controlled
within 60 days following confirmation of the excursion, the secretary may
require the operator to conduct additional sampling of monitoring wells, installation
of additional monitor wells, termination of injection in the portion of the
wellfield in which the excursion originated, or a combination of approaches to
assure control within a timely manner.
Source:
34 SDR 279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-48.