74:55:01:31.01. Well construction requirements -- Injection
wells. The following construction requirements apply to injection wells and
are in addition to the requirements listed in § 74:55:01:31:
All injection wells shall be
constructed to prevent the migration of fluids to unauthorized zones. The
casing and annular sealing material used in the construction of each newly
drilled well shall be designed for the life expectancy of the well. In
determining and specifying casing and annular sealing requirements, the
following factors shall be considered:
(1) Depth to the deepest
injection zone;
(2) Injection pressure,
external pressure, internal pressure, axial loading, and related information;
(3) Hole size;
(4) Size and grade of all
casing strings including well thickness, diameter, nominal weight, length,
joint specification, and construction material;
(5) Corrosiveness of
injected fluids and formation fluids;
(6) Lithology of injection
zone and confining zones; and
(7) Type and grade of cement
used to seal the annular space between the outer casing and borehole.
Source:
34 SDR 279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-32.