74:55:01:60.02. General postclosure inspection and maintenance
activities. During the postclosure period, the operator shall conduct site
maintenance and other activities in accordance with the approved postclosure
plan, including at a minimum quarterly inspections of
well heads over the entire mine site. If leaking well heads are observed during
the inspections they must be repaired or re-plugged as necessary.
Source:
34 SDR 279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-44.