74:55:01:60.01. Postclosure plan -- Estimated costs for
postclosure care. As part of the postclosure plan required by SDCL 45-6B-91, before the start of the postclosure period, the operator shall submit to the secretary the estimated costs for postclosure care and maintenance as computed in accordance with established engineering principles, including:
(1) The cost of long-term
ground water restoration to ensure continued compliance consistent with the
values listed in the restoration table contained in the permit for both
production and nonproduction zones;
(2) The cost of operation
of monitoring systems; and
(3) The cost of inspection
and maintenance activities to ensure compliance with all applicable
reclamation, design, and operating criteria.
Source:
34 SDR 279, effective May 12, 2008.
General
Authority: SDCL 34A-2-93(15).
Law
Implemented: SDCL 34A-2-40.